Previous Page  2 / 6 Next Page
Information
Show Menu
Previous Page 2 / 6 Next Page
Page Background

News Issue 1 September 2013

02

PSSA ANNUAL CONFERENCE

Tuesday 26th November

The 2013 PSSA Annual General Meeting and

Conference

will

be

held

on

Tuesday

26th

November at the London Chamber of Commerce &

Industry, 33Queen Street, London EC4 (10.30 – 16.00 hrs).

In addition to the formal business of the AGM, the day

will feature Verification Scheme updates and outside

speakers on security markets. Put the date in your diary now.

UK Trade & Investment have confirmed their

support for a trade mission to Sao Paulo, Brasilia

and Belo Horizonte – from 2nd to 6th December.

PSSA

Member News.

Bavak Security Group Launch New Speedgate

B-protect BR-P1

The

Belgium

department

of

Justice

have

set

up

a

complete

new

requirement program for Perimeter Protection in and around prisons.

Qualifications for the program consist of two elements, 1st: a burglar resistance, with

lighter tools than the European RC standards, but for a longer duration with two

persons, 2nd: a static pressure resistance, to withstand a situation where a crowd

is pushing. Depending on the location and treatment level,

the resistance must be 1,500 , 2,500 , 3,500 or 7,500kg. The

requirement for a pressure resistance of 3.500kg was a

complete

new

item

for

Bavak

security

group.

Development of the speedgate took Bavak 4 months

and the manufacturing and assembling time took a fur-

ther 12 weeks after approval of the final drawings. The

Speedgates are driven by an 230V 1,100W electro motor, which

makes the Speedgate move with a speed of 1 m/s. The Bullet

Resistance qualification (BR4-6) and burglar resistance

(RC3-4) were developed separately for other projects so it

all came together and resulted in a Speedgate of 7.500kg.

UKTI BRAZIL TRADE MISSION

December 2013

The target is to meet with

established contractors,

government, environmental

and military contacts. There

will be a market

access briefing at the British Embassy, networking events

and time for missioners’ own meetings. The mission is

organised by the Construction Equipment Association which

has well established contacts in Brazil. The programme

attracts a £600 UKTI Market Access Programme (MAP)

travel grant for eligible participants and a 25% discount

on BA flights for all. For further information email joanna.

oliver@admin.co.uk

and quote your PSSA membership.

Marshalls complete Holborn

Viaduct Project

Marshalls have successfully completed a project at the

famous Holborn Viaduct in Central London, supply-

ing a number of shallow mount crash tested bollards.

The bridge, celebrating its 150th Birthday this year, was

part of a major refurbishment of one of the most vital roads

in the City. It all started three years ago with the renova-

tion of the building adjacent to the bridge, which Marshalls

successfullyperimeter-protectedwithRhinoGuard™products

to prevent vehicle impact on the building’s revolving doors.

As the bridge is on the boundary of the City of

London and London Borough of Camden, which has a

security and surveillance cordon at the Viaduct, it was

decided by the City of London Police Force to add more

infrastructureand roadnetworkprotectionaround thebridge,

in the event of a vehicle borne attack on the City of London.

RhinoGuard™ bollards were successfully installed on

the top deck of the bridge on each side. The sleeves are

manufactured from stainless steel with double red highways

banding at the top, giving the product high corrosion resist-

anceandhighvisibilityduringlowvisibilityweatherconditions.

The bridge has now had the lighting and statures

restored and the gold leaf is currently being applied,

tying together the existing architecture of the surrounding

space with modern, robust and safe Marshalls products.

Crash Test Bollards

Bavak Speedgate